| 2 Visites |
0 Candidats |
Description du poste:
Job Description:
Mission:
Rationalize material needs according to delivery dates of the production program
Activities:
Plan materials needs referred to production programs and define/manage the Material Requirement Plan system (MRP)
Set the production parameters (e.g. safety stock), analyze MRP requirements and release purchase requisition/planned orders
Manage material management processes, by planning material requirements in alignment with production programs for the correct feeding of production lines
Plan material handling activities with a view on respecting the delivery dates in line with the production needs.
Analyze the outputs of MRP planning, proposing elements for optimization and exceptions verification and proposing necessary mitigation and recovery action
Preferibile esperienza in settori affini almeno biennale
Diploma tecnico o laurea ingengeria gestionale
Seniority:
Primary Location: IT - Tessera - Via Triestina 20
Additional Locations:
Contract Type:Permanent
Hybrid Working
| Origine: | Site web de l'entreprise |
| Publié: | 08 Avr 2026 (vérifié le 15 Avr 2026) |
| Type de poste: | Emploi |
| Secteur: | Aéronautique / Défense |
| Langues: | Anglais |